|
Post by General Contractor GreyWolf on Jul 28, 2017 12:38:27 GMT -5
Mission DiscussionIn this thread we will discuss the contracts in CS2. Some quick guidelines and rules for posting.Rules
- No swearing
- No flaming/trolling
- Only constructive criticism
Guidelines
- Name the contract or mission
- List the things you Dis-liked or found complicated
- List the things you liked or enjoyed about the named contract
- Provide ideas and or solutions
Have fun posting, the Devs from weltenbauer. are reading your responses.
|
|
|
Post by General Contractor GreyWolf on Jul 28, 2017 19:30:11 GMT -5
I absolutely loved the "Land Development" contracts in West Gate. My "progress and photos" thread has a ton of photos from those missions alone!
|
|
|
Post by General Contractor GreyWolf on Jul 30, 2017 21:15:04 GMT -5
What I really enjoy about contracts is using the dozers and excavators to move spoil. Earth moving is the part of the contract I enjoy the most.
|
|
|
Post by Eric Droster on Aug 6, 2017 14:04:23 GMT -5
Route 444 reconstruction project
Route 444 is in need of repair in dessert springs do to pot holes and large cracks showing in blacktop this is a four lane road with two lanes in both directions the southbound side of the road will need to be worked on first starting down at the building materials dealer and endings by sunny dinner for this during the southbound reconstruction traffic will need to be rerouted down the northbound side of the road meaning the road would be one lane in both directions during construction and the same for northbound construction for the repair portion of the project milling away the old blacktop is the first step next is to replace any canal works that run under the road next fill in the holes with gravel and sand next compact in ground after that grade and flatten the new road bed and last pave the new road and steamroll. This will need to be done on both sides of the road
|
|
|
Post by Eric Droster on Aug 6, 2017 14:08:14 GMT -5
Sorry I thought this forum was for new ideas
|
|
|
Post by General Contractor GreyWolf on Aug 7, 2017 1:00:23 GMT -5
No problem Eric. Please share more. I like how thoroughly you thought this Contract out. I enjoyed reading that. I think this would make a great hero mission and really utilize the CS2 road works!
|
|
|
Post by aldertonm on Aug 31, 2017 10:39:18 GMT -5
Need help with the mall building, just got to laying canal pipes and when I went back in it was all filled in but still on same job number which is 4 Attachments:
|
|
|
Post by General Contractor GreyWolf on Aug 31, 2017 11:27:18 GMT -5
I've had an issue where I messed up the ramp by driving the Dozer down with the blade slightly down. 😓
Just either hit the "redo" arrows or the "skip" arrows.
If you hit the redo " <_| " arrow it will reset that task. If the you the skip arrow " >> " you'll move to the next, but you won't get the Exp or the money for the task.
Let me know if this helps
|
|
tomm
Labourer
Posts: 2
|
Post by tomm on Mar 18, 2019 12:17:47 GMT -5
Can anyone help me i can't do the 75 meter jump has anyone got a picture or video thanks
|
|